S&K Staffing: Job Postings


If you have already applied with S&K staffing and are interested in any of the positions posted, be sure to call your local office with with your availability (Monday through Friday, between 8am and 10am or between 1pm and 3pm).

Page 1 of 5 (50 items)FirstPrev[1]2345NextLast v
Job Title [Filter]
Location [Filter]
Pay [Filter]
Effective [Filter]
Job Id 
ASSEMBLERPLYMOUTH15.006/24/2022TEMPI
ASSEMBLER - ASSEMBLE WOOD BOXES - USE OF SOME TOOLS 7AM - 3:30PM MONDAY - THURSDAY
AssemblyAuburn Hills$14 / $156/24/2022FISCI
Ensures assembly of parts are of high quality while still maintaining efficient output. DUTIES: 1. Operate assembly station according to instructions. 2. Change components during color changes if applicable. 3. Ensure the components being used for assembly are without defects. 4. Make sure the paperwork is completed properly. Safety glasses required - no jewelry Day Shift $14.00/hr Afternoon/Midnight : $15.00/hr
ASSEMBLYLIVONIA16.006/24/2022HELMI
ASSEMBLY - ASSEMBLY OF KITS, PULLING CORRECT VEHICLE MANUALS AND PACKAGING IN BOXES. DAY SHIFT 8 AM - 4:30 PM
ASSEMBLYCLINTON TWP$15.006/24/2022TWEDI
Assembly- Loading, packaging, and Inspection of Car Manuals. 1st Shift- 6am-2:30pm ***MANDATORY OVERTIME UNTIL 4:30PM***
ASSEMBLYUTICA14.756/24/2022USFUI
GENERAL LABOR - ASSEMBLY AND PART PRODUCTION 1ST SHIFT: 6:30AM-2:30PM 2ND SHIFT: 2:30PM-10:30PM 3RD SHIFT: 10:30PM-6:30AM ***OFTEN TRAIN ON 1ST SHIFT FOR THE 1ST TWO WEEKS.***
ASSEMBLYCHESTERFIELD$15.006/24/2022WPIII
ASSEMBLY- PUTTING NUTS ON BOLTS THEN PRESSA BUTTON ON THE TOP OF THE MACHINE. Monday- Friday Day Shift: 6:30am-3pm Afternoon Shift: 3:30pm - 12am ECOATING DEPT- HANGING LIGHT PARTS ON AN ASSEMBLY LINE. Monday-Thursday Day Shift: 6am- 4:30pm Afternoon Shift: 4:30pm-3am
Embroidery Clean UpRochester Hills$14.006/24/2022MACKI
Shift Time : 8a - 4:30p Description: - Prepping / packing garments - Cleaning embroidered parts - Cleaning/organizing work areas
Food ProductionDetroit12.006/24/2022BETTI
Working in a food production facility. Packaging chips, loading and unloading lines. Standing position, lifting up to 20lbs. Must have reliable transportation. 1st Shift: 6am-2:30pm 2nd Shift: 2:30pm- 11pm Cleaning the machines and the facility, Sanitation. 3rd Shift: 9pm-5:30am
Food ProductionChesterfield13.85-15.256/24/2022TURRI
Production Position- loading and unloading, boxing and packaging pasta and rice. (1st and 2nd Shift) Sanitation Position- Cleaning the machines and facility. (3rd shift) 1ST SHIFT - 13.85/HR 2ND SHIFT - 14.05/HR 3RD SHIFT - 15.25/HR ***Currently working 6 to 7 days a week*** ***No jewelry, fake nails, fake eye lashes and piercings*** **Must have work boots or slip resistant shoes**
Food ProductionRoseville13.85-15.256/24/2022TURRI
Production - loading and unloading, boxing and packaging pasta and rice. (1st and 2nd shift) Sanitation - cleaning the machines and the facility. (3rd shift) ***No jewelry, fake nails, fake eye lashes and piercings*** **Must have work boots or slip resistant shoes** 1ST SHIFT - 13.85/HR 2ND SHIFT - 14.05/HR 3RD SHIFT - 15.25/HR
Page 1 of 5 (50 items)FirstPrev[1]2345NextLast v
Job Title [Filter]
Location [Filter]
Pay [Filter]
Effective [Filter]
Job Id 
No data to display